Basic performance requirements:
1. Cleanliness requirements in laminar flow transfer window: B garbage;
2. Double shell inside and outside, circular arc processing inside to ensure seamless connection;
3. The negative pressure laminar flow design is adopted, the air flow direction adopts the up-send down return mode, the side return air adopts 304 stainless steel cold-rolled plate punching design, and the well is equipped with reinforcing bars;
4. Filter: The initial effect filter adopts G4, the high efficiency banter adopts H14, the efficiency is 99.99%;
5. Wind speed; After the high efficiency filter, the outlet air speed is controlled at 0.3-0.4m/s(tested at 150m below the high efficiency outlet air leveling plate). Pressure difference function: display the pressure difference of the overcurrent (efficient 0-500Pa), accuracy ±5Pa;
6. Control function: fan start/stop button, built-in electronic door interlock: set UV lamp, design separate switch; · The HEPA filter can be disassembled and installed separately from the upper box for easy maintenance and replacement of the speedster;
7. Access port is provided on the upper part of the transfer window for fan maintenance; · Noise: Noise <65db during normal operation of the transfer window;
8. High efficiency air flow equalizing plate: 304 stainless steel mesh plate;
Size Information:
OD (W*H*D)mm |
ID (W*H*D)mm |
Shower Flow Rate |
Shower Time |
Hepa Filter Size (mm) |
Motor Power |
Power |
800*1100*650 |
600*600*600 |
0.3-0.4(m/s) |
0-999s |
484*484*90 |
0.4KW |
AC220V / AC380V |
1000*1300*850 |
800*800*800 |
600*600*90 |
Company Profile
Xinxiang North Filter Co., Ltd. is a professional industrial filter manufacturer integrating design,production and marketing.We have advanced production equipment,strong technical force, perfect testing means and excellent after-sales service,We can provide our customers with a variety of high-quality products,Our products include air filters, water filters, oil filters, water-oil separation devices, etc.Products are widely used in petroleum,metallurgical machinery,textile,automobile,air conditioning and etc.
Quality and Best customer service is our goal,welcome to contact us.
Packaging & Shipping
1.Package Requirements: Carton box and pallets.
2.Delivery Time: 7-15 working days after advanced payment.
3.Ways of Transportation: By International express / air / sea / railway.
4.Loading Port: Shanghai Port,Tianjin Port,Qingdao Port or other Chinese ports.